Interior Design White Glass Chips Terrazzo Stone Grey
Product Description Terrazzo Stone For Wall Decor, Flooring, Countertops, Coffee Table More Designs Each terrazzo can be
Send your inquiryDESCRIPTION
Basic Info.
Model NO. | G2 |
Thickness | 17mm, 18mm, 20mm, Custom |
Usage | Commercial, Bathroom, Commercial Wall |
Customized | Customized |
Name | Terrazzo Stone |
Transport Package | Slabs Packed in Wooden Frames |
Trademark | MOREROOM STONE |
Origin | Foshan |
Production Capacity | 18000 Sqaure Meters Per Month |
Product Description
Product DescriptionName | Terrazzo Stone |
Finishing | Polished, Honed, Bush-hammered |
Size | (1) 2700x1800mm,3200x1600mm (2)900x600mm, 900x900mm,900x1800mm (3)600x1200mm (4) customized according to Clients Requirement. |
Process Production | 1. Mixed aggregate and cement , pour into the mold 2. Pressed into a block with the hydraulic press 3. Sealed and left for 28 days 4. Cut the block into slate 5.Polishing 6. Waterjet cuts out the specified shape and size 7. Antifouling treatment 8. Packing and delivery |
Thickness | 16mm - 30mm |
Application | Wall, Floor, Table, Countertop, Reception Desk, Stairs, Furniture for Commercial, Public Area & Residential |
Service | Free Sample, Customized Products Like Tables, Countertops ect. |
Choices | There are more than 100 items of choices for your reference. |
Advantages | Professional R&D Department for Product Design, Every Three Months there will be new designs for the market. |
Terrazzo Stone For Wall Decor, Flooring, Countertops, Coffee Table
More Designs
Each terrazzo can be decomposed in the nature. We value the innovation as well as the development process of eco-friendly construction material, just to accomplish the goal of zero carbon emission.
Factory
1. MOREROOM STONE Service
Free Sample, +100 Items Choices, New Designs will be shown every three months
2. How to carry and store the terrazzo?
When carrying the terrazzo , lift it from the bottom and clutch at the both sides to avoid the corners being smashed. The right way to store the terrazzo : place on thick carton or plank and recline to the wall, 10 pieces for a set. Do not pile them up.
3. How long does the installation take?
The total installation time varies and mostly depends on the design complexity, technical issue and the project scale. For small scale terrazzo installation, it generally takes about 8 days. For detailed installation schedule, please contact our sales executive.